Year
2025
Company
SFWMD
Role
Sub to Prime Contractor
Overview
- Demolition of a bridge including underwater bulkheads and pilings.
- Demolition of generator bunk structure.
- Removal of antenna pole and testing wells.
- Dredging a canal using electronic grade tools to meet strict slope and grade requirements underwater with long reach excavator.
- Load and haul over 500 dump trucks of material.
- Use the hauled off material to build a canal road further down the canal.
- Install hundreds of trucks of bedding stone and rip-rap placed exactly to specifications.
- Grading of hillside after material was balanced.